Detect, prove and recover what you're owed.

Entitlement is buried across months of contracts, programmes, site instructions, correspondence and cost records. Hecato finds it in time to claim it.

Built for
  • Owners
  • Developers
  • Contractors
  • Subcontractors
  • Claims consultancies
Designed for
  • FIDIC
  • NEC
  • JCT
  • AIA
  • ConsensusDocs

The engine

Detect. Prove. Recover.

Three steps, run against the contract you actually signed, amendments included. Each one produces something your team can read, check and put its name to.

Contract standard

Hecato is also developed for alternative and region specific contract standards. To find out whether we have built for yours, contact us.

01

Detect.

Entitlement is found and flagged in real time ahead of deadlines.

Reads
The contract and its amendments, the programme, correspondence, instructions and cost records.
Produces
An entitlement register. Every change event and variation carries the clause that creates it and the deadline that forfeits it.
Entitlement registerNorthfield Substation
  • 01

    Ground conditions differ from the site investigation report

    Physical conditions

    NEC4 cl. 60.1(12)Notice due: 4 days
  • 02

    Instructed change to riser layout, levels 4 to 9

    Change to the Scope

    NEC4 cl. 60.1(1)Notice due: 11 days
  • 03

    Access to the substation interface area not given on time

    Access not given by the access date

    NEC4 cl. 60.1(2)Notice due: 19 days
  • 04

    Client supplied switchgear delivered three weeks late

    Client did not provide by the date

    NEC4 cl. 60.1(3)Notice due: 26 days

Deadlines shown are calculated from the executed contract, including the Z clause amendments, not the standard form.

02

Prove.

Both halves of the claim: that you are entitled, and how much you are owed.

Reads
A detected event, the record behind it, and the cost and programme data it touches.
Produces
Entitlement established against the clause, then quantum built up line by line on a stated basis.
Entitlement established12 documents

The Project Manager's instruction changed the riser layout on levels 4 to 9. The Accepted Programme shows the mechanical package pushed 96 days beyond the Completion Date, with no compensating terminal float. A compensation event under cl. 60.1(1) is established.

Z1 Amendment to clause 61.3, notice periodClause 61, notifying compensation events
QuantumAwaiting entitlement
  • 01

    Prolongation, time related site costs

    96 days at $18,400

    $1,766,400

  • 02

    Disruption, mechanical second fix

    Measured mile

    $1,412,000

  • 03

    Additional preliminaries

    Allocated, 96 days

    $402,600

  • 04

    Finance charge

    Contract rate, 214 days

    $118,200

Quantum calculated

Est. value, one detected claim

$0

03

Recover.

A submission ready claim, served on time and signed by your team.

Reads
The proven entitlement and its quantum.
Produces
The claim document, contractually compliant and held at the review gate until a person signs it.
Claim // ready to serve
New message
Draft
To
project.manager@northfield-client.co
Cc
commercial@contractor.co
Subject
Northfield Substation | Notification of a compensation event | NS-CE-0142

Dear Project Manager, We give notice of a compensation event under clause 61.3 in respect of your instruction dated 14 March changing the riser layout at levels 4 to 9. Our quotation is attached, setting out the effect on the Prices and on the Completion Date, with the programme and cost records relied on. We should be grateful for your reply under clause 62.3 within the period stated. Regards

SendHeld for commercial sign-off

Hecato prepares the notice and the covering message in the form the contract requires. Nothing is sent until a person signs it off.

Sources

The money you are owed is not in any one document.

Entitlement is established by a site instruction, a programme revision and a cost record agreeing with each other. Read separately they say nothing. Read together they are a claim.

  • 01

    Detect.

  • 02

    Prove.

  • 03

    Recover.

  • DOC-01

    Contract

    and its amendments

  • DOC-02

    Programme

    baseline and updates

  • DOC-03

    Site instructions

    and daily logs

  • DOC-04

    Correspondence

    email threads

  • DOC-05

    Cost records

    labour, plant, sub

Integrations and governance

Connects with your stack. Built for enterprise deployment.

Hecato reads from the systems your teams already run. It does not replace any of them and does not ask anyone to move where they work.

  • 01

    Common data environments

    Contract documents, drawings, instructions, RFIs and the correspondence record.

  • 02

    Programme and planning

    Baselines, revisions and progress updates, so the accepted programme at each dividing date is the one used.

  • 03

    Cost systems and ERP

    Labour, plant, subcontract and applications, at the level of detail quantum has to be built from.

  • 04

    Document stores

    SharePoint, shared drives and project folders, including the amendments and schedules that rarely sit in the CDE.

  • 05

    Correspondence

    Email threads, site instructions and daily logs, which is where entitlement usually first appears.

Integration availability depends on deployment scope. Systems such as Procore, Aconex, Asite, Primavera P6, Asta Powerproject and COINS may be connected as part of deployment.

Governed by

  • Permissioned access

    Teams see the projects and documents their role allows, and nothing else.

  • Audit trails

    Every figure traces to the document, revision and clause it came from.

  • Human review by design

    Claims are held at the review gate. Nothing is served without sign-off.

  • Data residency controls

    Hosting agreed against the restrictions that flow down your main contract.

  • Deployment in your environment

    Available where data classification prohibits an external processor.

Domain expertise

Built by quantity surveyors, claims specialists and finance professionals.

Hecato is built with commercial directors, project executives and practising quantity surveyors working alongside finance professionals who have spent their careers underwriting multi-billion-dollar deals on the strength of the documents behind them.

Questions

What commercial teams ask first.

FIDIC, NEC, JCT, AIA and ConsensusDocs. Our AI agents read the executed contract including its amendments. Hecato is also developing capabilities for alternative and region specific contract standards. To find out whether we have built for yours,

Yes. Hecato reads from the common data environment, the cost system and the planning tool you already run. It is not a replacement for any of them and does not ask your team to move where they work.

Government and defence adjacent work often carries restrictions that flow down through the main contract, including limits on sub-processors and where data can sit. Hecato is built to be deployed inside your own environment where that is required. Hosting, access, retention and integration are agreed as part of the engagement rather than assumed.

Access is permissioned, output is source linked so it can be audited back to the original document, and project data is not used to train models for anyone else. The specifics are set out in writing before any records are shared.

No. The demo runs on our documents. Nothing to pull out of the archive, nothing to clear with legal. You see the output first and decide from there.

See it work

Watch Hecato surface the money buried across your contracts.

  • Human sign-off
  • Source linked output
  • Clause level traceability
  • Permissioned access